Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
refers to the soil removed from an excavation | 0.32 | 0.6 | 877 | 42 | 45 |
refers | 0.07 | 0.5 | 9355 | 76 | 6 |
to | 0.66 | 0.7 | 4543 | 88 | 2 |
the | 1.81 | 0.1 | 5420 | 76 | 3 |
soil | 0.53 | 0.6 | 1564 | 83 | 4 |
removed | 1.73 | 0.4 | 9138 | 31 | 7 |
from | 0.62 | 0.7 | 4084 | 74 | 4 |
an | 0.62 | 0.9 | 6580 | 25 | 2 |
excavation | 1.71 | 0.5 | 7527 | 20 | 10 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
refers to the soil removed from an excavation | 0.14 | 0.3 | 5937 | 81 |
soil removed from an excavation | 0.13 | 0.5 | 6879 | 62 |
excavation and removal of contaminated soil | 1.94 | 0.6 | 146 | 95 |
removal of soil from site | 1.32 | 0.4 | 3425 | 29 |
excavation of contaminated soil | 1.36 | 0.7 | 9318 | 23 |
type a soil excavation | 0.36 | 0.1 | 5510 | 82 |
classification of soil for excavation | 1.17 | 0.4 | 8176 | 59 |
excavation types of soil | 0.82 | 0.1 | 9607 | 98 |
soil and dirt removal | 1.62 | 0.1 | 3897 | 24 |
removal of contaminated soil | 0.09 | 0.5 | 883 | 13 |
structure excavation common soil | 0.02 | 0.3 | 6144 | 84 |
removal of top soil | 1.27 | 0.7 | 4029 | 65 |
removal of topsoil is called | 1.33 | 0.8 | 4090 | 65 |