Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
mumbai pune expressway open or closed | 0.08 | 0.9 | 760 | 66 | 37 |
mumbai | 1.25 | 0.4 | 2013 | 77 | 6 |
pune | 1.91 | 0.4 | 1669 | 25 | 4 |
expressway | 0.18 | 0.7 | 1312 | 38 | 10 |
open | 0.87 | 0.6 | 8482 | 26 | 4 |
or | 0.28 | 1 | 5121 | 3 | 2 |
closed | 0.17 | 0.8 | 5240 | 41 | 6 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
mumbai pune expressway open or closed | 1.51 | 0.7 | 8290 | 49 |