Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
iso ne interconnection queue | 1.88 | 0.7 | 193 | 36 | 28 |
iso | 0.11 | 0.8 | 5880 | 59 | 3 |
ne | 1 | 0.5 | 5985 | 28 | 2 |
interconnection | 0.08 | 0.9 | 552 | 58 | 15 |
queue | 1.57 | 0.8 | 1598 | 71 | 5 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
iso ne interconnection queue | 1.1 | 0.6 | 4728 | 54 |