Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
routings in sap pp | 1.95 | 0.3 | 8268 | 41 | 18 |
routings | 1.64 | 0.3 | 4683 | 12 | 8 |
in | 1.3 | 0.7 | 7819 | 72 | 2 |
sap | 1.76 | 0.1 | 8030 | 20 | 3 |
pp | 1.15 | 0.1 | 6489 | 83 | 2 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
routings in sap pp | 1.96 | 0.1 | 7513 | 87 |
routing in sap pp | 0.25 | 0.1 | 596 | 10 |
what is routing in sap pp | 0.65 | 0.7 | 739 | 57 |
parallel sequence in routing sap pp | 1.36 | 0.4 | 7559 | 40 |
reference routing in sap pp | 0.3 | 0.5 | 3300 | 65 |
routing tcode in sap pp | 1.26 | 0.7 | 6183 | 79 |
rate routing in sap pp | 0.77 | 0.3 | 1584 | 54 |
what is rate routing in sap pp | 1.81 | 0.3 | 7936 | 93 |
routing table in sap pp | 1.96 | 1 | 6686 | 49 |
routing in sap pi | 1.58 | 0.2 | 7815 | 57 |
sap pp routing tables | 0.58 | 0.9 | 2567 | 35 |
What is routing and work centers in SAP PP (Production Planning), Routing describes a production process. Routings in production planning specify the sequence of the operations. Routings also contain other production information such as where the work will be performed, the time required to carry out the work, materials and equipment required etc.
What are the levels of sap pp routing?SAP PP routing has different levels in its structure and different types of data are maintained at each level. Here are these levels: SAP PP routing header contains information about routing status, usage, validity period, lot size, etc. Usage defines for which applications the routing can be used.
What is routing in SAP?Routings also contain other production information such as where the work will be performed, the time required to carry out the work, materials and equipment required etc. Based on the type of workorder, a special selection procedure is used to choose the correct routing. Workcenters are an important part of production planning in SAP.
What is routing in pp?Routing is used for scheduling and costing of operation for raw and finished products. Routing is used to calculate the operation cost for a finished product. How to Create Routing in PP? Use T-Code: CA01 or go to Logistics → Production → Master Data → Routings → Routings → Standard Routings → Create